English translation for "boulder concrete"
|
- 卵石混凝土
蛮石混凝土
Related Translations:
boulder: n.圆石,卵石;【地质学;地理学】冰砾,巨砾;漂砾。
- Example Sentences:
| 1. | The experiment determined the fracture process and the parameter of the fracture properties of two different aggregate concrete and recorded the stable whole fracture curves of boulder concrete and crushed stone concrete separately , which are determined through three - point - bending method and wedge - split tensile method 测定了两种粗骨料混凝土的断裂过程及断裂特征参数,分别记录了两种试验方法测定的卵石混凝土和碎石混凝土的断裂全曲线。 | | 2. | According to the recorded full process fracture curve , the paper calculated and compared the fracture toughness ( kic ) , the fracture energy ( gf ) and crack tip opening displacement ( ctod ) of the different strength grade boulder concrete and crushed stone concrete , it is found that the maximal load ( fmax ) and the fracture toughness ( kic ) of boulder concrete and crushed stone concrete increase when the strength of them increases , so does the fracture energy of boulder concrete , but the fracture energy of crushed stone concrete does n ' t obviously increase when it ' s strength increases . the crack tip opening displacement ( ctod ) of all specimens chang less when the strength of concrete increases , so it is concluded that the location of the axle in the ligament of the specimens is relatively stable 根据记录的全曲线,计算了不同强度等级的卵石混凝土、碎石混凝土的断裂韧度k _ ( ic ) 、断裂能g _ f以及裂缝的尖端开口位移ctod ,比较了不同强度等级卵石混凝土及碎石混凝土的断裂韧度k _ ( ic ) 、断裂能g _ f以及裂缝的尖端开口位移ctod的关系,发现卵石混凝土、碎石混凝土的荷载峰值fmax 、断裂韧度k _ ( ic )随强度增加而增加,卵石混凝土的断裂能g _ f随强度增加而呈增加趋势,碎石混凝土的断裂能g _ f随强度增加变化趋势平直,增势不明显。 | | 3. | By using 5000kn pressure - bent testing machine , the specimens of boulder concrete and crushed stone concrete were tested through three - point - bending method and wedge - split tensile method , the scale division of the index dial of pressure - bent testing machine is larger , whereas the predicted test - load is lesser , so the velocity of exerted load is controlled through observing the reading of the multimeter which is connected with the collecting systerm in order to continuously exert test - load 本文使用5000kn压弯实验机,对不同强度等级的卵石混凝土和碎石混凝土试件分别进行了三点弯曲试验和楔入劈拉试验。试验过程中,由于实验机吨位较大,而试验荷载预计较小,为了能够有效地控制加载大小和加载速度,采用通过观察与荷载传感器相连的万用表读数控制加载速度的方法,连续加载。 |
- Similar Words:
- "boulder clause" English translation, "boulder clay" English translation, "boulder clay soil" English translation, "boulder closure" English translation, "boulder coast" English translation, "boulder conglomerate" English translation, "boulder county, colorado" English translation, "boulder couplet" English translation, "boulder cracker" English translation, "boulder creek" English translation
|
|
|